Total Inspections
5,402
3/4/2026 – 4/25/2026
Inspection Types
116
Active types
Pass Rate
56%
2,720 passed
Fail Rate
31%
1,492 failed
Change vs Prior Period
Volume
↓ 13.6%vs prior 60 days
Fail Rate
↓ 1.8%vs prior 60 days
Top Movers
- ↓ 40%Rough
- ↓ 29%Interior/Exterior Lathing
- ↓ 24%ELECTRICAL-Final
Top Inspection Types by Volume
| Type | Total | Pass Rate |
|---|---|---|
| Final | 1,563 | 60% |
| Service/Power Release | 339 | 55% |
| Inspection | 235 | 100% |
| Rough | 201 | 43% |
| CofO Issuance | 188 | 52% |
| Smoke Detectors | 180 | 76% |
| Floor/Roof Diaphrgm/Shear Wall | 162 | 46% |
| Footing/Foundation/Slab | 140 | 56% |
| SGSOV-Seismic Gas S/O Valve | 133 | 62% |
| Pre-Inspection | 129 | 30% |
Highest Fail Rates
| Type | Fail Rate | Volume |
|---|---|---|
| PLUMBING-Rough | 49% | 117 |
| CofO Issuance | 47% | 188 |
| Pre-Inspection | 46% | 129 |
| Rough | 43% | 201 |
| Floor/Roof Diaphrgm/Shear Wall | 42% | 162 |
| BUILDING-Rough-Frame | 41% | 123 |
| Interior/Exterior Lathing | 40% | 124 |
| Service/Power Release | 36% | 339 |
| Footing/Foundation/Slab | 34% | 140 |
| Green Building Final | 33% | 108 |
Results Breakdown (LADBS Categories)
Approved
1,366
25%
Permit Finaled
997
18%
Insp Scheduled
549
10%
Corrections Issued
472
9%
Insp Cancelled
461
9%
Not Ready for Inspection
338
6%
Partial Approval
247
5%
Partial Inspection
187
3%
CofO Issued
98
2%
CofO in Progress
89
2%
Data Quality & Transparency
99.99% Coverage
We ingest directly from the official LADBS public dataset. A small number of records (~0.006%) are excluded because they're missing required fields like inspection type or result — these are data quality issues in the source system, not our processing.
Duplicate Tracking
LADBS sometimes records the same inspection multiple times. We detect and track these duplicates using Socrata's unique row IDs, ensuring accurate counts while preserving evidence of source data quality issues.
Source: Los Angeles Department of Building and Safety (LADBS) • Dataset ID: 9w5z-rg2h •View on LA Open Data